S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
243. The authorization holder must, within 6 months after the granting of the authorization by the Minister, complete the temporary closure work.
O.C. 1251-2018, s. 243.
In force: 2018-09-20
243. The authorization holder must, within 6 months after the granting of the authorization by the Minister, complete the temporary closure work.
O.C. 1251-2018, s. 243.